Tornado Shelter - Construction Drawings
These construction drawings represent the finished structure. Construction means and methods are found on the construction guide pages.
The builder shall provide weather protection to the structure during construction.
If there is a conflict among the construction guide, general notes, specifications, and plants, the more stringent criteria shall apply.
The builder shall be responsible for verification and coordination of all dimensions, conditions, and elevations.
Complete inspection requirements shall be as directed by the local building department.
The construction drawings shall not be scaled.
Follow manufacturer's recommendations for installation of uplift/shear resistance connectors.
For all construction, use only screws and hardware that have been evaluated through an ANSI-approved product certification body such as IAPMO-OES or ICC-ES.
Ventilation is to be provided per plan details.
Maximum wall height for shelter shall be 8'-0".