Download (PDF 124 KB): https://research.fs.usda.gov/download/treesearch/28026.pdf
Abstract
This paper describes the process used to redesign a flood control project on three creeks in central Contra Costa County, California, about 15 miles east of San Francisco. Involved was door-to-door organizing to form a neighborhood group which in turn used a county-appointed committee, a city-appointed committee, a State grant and a private consultant working with the county staff to help achieve an acceptable project. It was redesigned to preserve the riparian and environmental values of the urban creeks while providing 25-year flood protection. Detention basins and bypass pipes are key components of the project. Ongoing volunteer projects are planned involving channel clearing, revegetation, and bank stabilization.
Parent Publication
Citation
Ortiz, Bev. 1989. Redesign of a Flood Control Project by Citizen Initiative. In: Abell, Dana L., Technical Coordinator. 1989. Proceedings of the California Riparian Systems Conference: protection, management, and restoration for the 1990s; 1988 September 22-24; Davis, CA. Gen. Tech. Rep. PSW-GTR-110. Berkeley, CA: Pacific Southwest Forest and Range Experiment Station, Forest Service, U.S. Department of Agriculture; p. 495-500