Caspar Creek ecology project: annual report, 1967-68

Informally Refereed
Download (PDF 277 KB): https://research.fs.usda.gov/download/treesearch/7747.pdf

Abstract

Two summers of calibration of the north and south fork Caspar Creek stream ecology study areas were completed in 1967. Clearing for logging road construction in the south fork watershed began in May, 1957. Bulldozer operations first reached the stream itself in July. Some calibration determinations were made during the period of road construction and stream clearance ending September 12.

Citation

DeWitt, John W. 1968. Caspar Creek ecology project: annual report, 1967-68. Unpublished report, Humboldt State College. 30 June 1968. 20 p.